Skip to content

Flycam Flowline Professional Series 5-12kg / 11-26lb

Ergonomic Body Support for Camera & Gimbals

Original price US $460.00 - Original price US $460.00
Original price
US $460.00
US $460.00 - US $460.00
Current price US $460.00
SKU : FLCM-FLN-400N

01.

THE MOST COMFORTABLE SHOOTING EXPERIENCE
We understand extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.

Flycam Flowline Professional Series 5-12kg / 11-26lb

02.

THE FLOWLINE VEST
The Flowline Vest has Multiple Layers of Padding which ensures more support around the waist, allowing you to mount large setups and shoot for longer duration comfortably. It has a flexible belt system & adjustable vest rods on sides which will enable a comfortable fit for all body types.

03.

SMOOTHER STEADIER SHOTS!
The Harness takes the weight off your neck, arms and shoulders, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots. The Support Rope also adds a point of Contact which reduces Vibrations.

Flycam Flowline Professional Series 5-12kg / 11-26lb
Flycam Flowline Professional Series 5-12kg / 11-26lb

04.

ADAPTIVE CAMERA SUPPORT RIG
This Flowline System has various options such as Flowline 300N, 400N, 500N, 600N and 750N and fits multiple Camera and Gimbal Setups between the weight range of 5kg/11lbs to 19kg/42lbs. You can choose the Flycam Model depending on the Payload you plan putting on it and it’ll self-balance that load using the Gas Springs integrated into the design.
The Height adjustable support bar enables you to adjust the height of the support arm according to your requirement. The top bar also allows for 360° rotation to capture shots with incredible freedom of movement.

05.

BUILT TO LAST
We know set life can take a toll on your gear. Built with the highest quality materials and custom-designed Gas Springs, the Flycam Flowline is sure to last you a lifetime. It comes in a high-quality protective bag that lets you easily carry it with you around the world.

Flycam Flowline Professional Series 5-12kg / 11-26lb

IN-ACTION VIDEOS

SPECIFICATIONS

FLOWLINE 300N

Support Arm Rotation

  360°

Product Weight (Without Packing)

  Complete 4kg (9lb)

Height

  Mounted: 100 cm (39'')
  Folded: 60 cm (23.6'')

Capacity

  5 - 8 kg (11 - 17.6 lb)

Suspension line length

  107 cm (42'') when fully stretched

Top Bar Length

  Including extension : 520mm
  Excluding extension : 340mm

Min. waist hip strap length

  87 cm (34'')

Max. waist hip strap length

  142 cm (56'')

Extension

  18 cm (7'')

FLOWLINE 400N

Support Arm Rotation

  360°

Product Weight (Without Packing)

  Complete 4 kg (9lb)

Height

  Mounted: 100 cm (39'')
  Folded: 60 cm (23.6'')

Capacity

  8 - 10 kg (17.6 - 22 lb)

Suspension line length

  107 cm (42'') when fully stretched

Top Bar Length

  Including extension : 520mm
  Excluding extension : 340mm

Min. waist hip strap length

  87 cm (34'')

Max. waist hip strap length

  142 cm (56'')

Extension

  18 cm (7'')

FLOWLINE 500N

Support Arm Rotation

  360°

Product Weight (Without Packing)

  Complete 4 kg (9lb)

Height

  Mounted: 100 cm (39'')
  Folded: 60 cm (23.6'')

Capacity

  10 - 12 kg (22 - 26.4 lb)

Suspension line length

  107 cm (42'') when fully stretched

Top Bar Length

  Including extension : 520mm
  Excluding extension : 340mm

Min. waist hip strap length

  87 cm (34'')

Max. waist hip strap length

  142 cm (56'')

Extension

  18 cm (7'')

IN THE BOX

Flycam Flowline Professional Series 5-12kg / 11-26lb
Packing Bag

FAQ

Q: Does this come with the shoulder rig?

  Ans: No, the shoulder rig is not included with this Flowline model.

Q: Is this model ideal for gimbal and dslr or should i get something with heavier weight capacity?

  Ans: This Flowline comes with three different weight capacities as mentioned below :

  - Flowline 300N: 5 - 8 kg (11 - 17.6 lb)
  - Flowline 400N: 8 - 10 kg (17.6 - 22 lb)
  - Flowline 500N: 10 - 12 kg (22 - 26.4 lb)

Q: What body sizes it will fit to?

  Ans: It will fit to all body sizes from 28” to 56”.

Q: Can I use cage with this flowline?

  Ans: Yes, you can use a cage with this flowline.

Q: Can I purchase extra spring of higher strength to change and use heavier camera with it?

  Ans: Yes, you can buy extra springs of higher strength to use for heavier camera setup.

Q: What is the weight of the Flowline?

  Ans: The Flycam Flowline itself weighs 4kg.

Q: For how long can I use it continuously?

  Ans: This Flycam Flowline system can be used for whole day without any fatigue.

Q: Can I use the Flowline placid arm with this Flycam flowline?

  Ans: Yes, you can use the Flowline placid arm with this Flycam flowline model.

Q: Will this work with my easyrig model?

  Ans: Yes, this will work with your easyrig model. You just need to drill a hole for mounting the placid arm onto your rig.

Q: Does it come in bag packing?

  Ans: Yes, this Flycam Flowline comes in a bag packing for easy transportation.

Q: Is it returnable for a full refund if it doesn’t meet my expectations upon delivery?

  Ans: Yes, absolutely. We always backup our sales. In case, you don't like the product, we take it back within 30 days and you get a 100% refund.

Q: What is the warranty?

Ans: We provide 1 year warranty from the date of purchase Items which are covered by the warranty period will be replaced at no cost to the customer.Replacement parts of the product will be provided at nominal cost (covering the cost price of the replacement parts only) to the customers after the Warranty Period has expired.


delivery

Guaranteed Fast Delivery
For all orders

customer service

Quick and Efficient
Customer service

easy returns

Easy Returns
Up to 30 days

warranty

1-Year Warranty
On All Products





  • Does this come with the shoulder rig?

    No, the shoulder rig is not included with this Flowline model.

  • Is this model ideal for gimbal and dslr or should i get something with heavier weight capacity?

    This Flowline comes with three different weight capacities as mentioned below : - Flowline 300N: 5 - 8 kg (11 - 17.6 lb) - Flowline 400N: 8 - 10 kg (17.6 - 22 lb) - Flowline 500N: 10 - 12 kg (22 - 26.4 lb)

  • Can I use cage with this flowline?

    Yes, you can use a cage with this flowline.

  • Can I purchase extra spring of higher strength to change and use heavier camera with it?

    Yes, you can buy extra springs of higher strength to use for heavier camera setup.

  • What is the weight of the Flowline?

    The Flycam Flowline itself weighs 4kg.

  • For how long can I use it continuously?

    This Flycam Flowline system can be used for whole day without any fatigue.

  • Can I use the Flowline placid arm with this Flycam flowline?

    Yes, you can use the Flowline placid arm with this Flycam flowline model.

  • Will this work with my easyrig model?

    Yes, this will work with your easyrig model. You just need to drill a hole for mounting the placid arm onto your rig.

  • Does it come in bag packing?

    Yes, this Flycam Flowline comes in a bag packing for easy transportation.

  • What is the warranty?

    We provide 1 year warranty from the date of purchase Items which are covered by the warranty period will be replaced at no cost to the customer.Replacement parts of the product will be provided at nominal cost (covering the cost price of the replacement parts only) to the customers after the Warranty Period has expired.

  • Is Flycam Flowline Edge Stabilization Arm is compatible with FLCM-FLN-500N Flowline system.

    Yes, Flycam Flowline Edge Stabilization Arm is compatible with FLCM-FLN-500N Flowline system.