Skip to content
Description
Description

01.

THE MOST COMFORTABLE SHOOTING EXPERIENCE
We understand, extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.

Flycam Basic Flowline with 180° Rotation (3-7.5kg/6-16lb)
Flycam Basic Flowline with 180° Rotation (3-7.5kg/6-16lb)

02.

SMOOTHER STEADIER SHOTS!
The Harness takes the weight off your arms and shoulder, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots. The Top Bar with 180° Rotation capability allows easy camera movements in different angles. The Support Rope also adds an additional point of Contact which reduces Vibrations.

03.

THE MOST VERSATILE CAMERA SUPPORT RIG
This Flowline System has been designed to accommodate all Camera and Gimbal Setups between 3kg to 7.5kg (6lb/16lb).
The spring tension can be adjusted to balance the load placed on the Support Rope by turning the knob present on the back of the rig.

Flycam Basic Flowline with 180° Rotation (3-7.5kg/6-16lb)

IN-ACTION VIDEOS

SPECIFICATIONS

Support Arm Rotation

  180°

Flowline Weight

  Complete 3.6 kg (8 lb)

Height

  Mounted: 100 cm (39.4 in) Folded: 60 cm (23.6 in)

Minimum Load Capacity

  3 kg(6.6 lb)

Maximum Load Capacity

  7.5 kg(16.53 lb)

Suspension line length (Rope)

  152.5 cm (60 in.) when fully stretched

Top Bar Length

  560mm

Top Bar Rotation

  180°

Min. waist hip strap length

  81 cm (32 in)

Max. waist hip strap length

  125 cm (49 in)

IN THE BOX

Flycam Basic Flowline with 180° Rotation
Bag Packing

USER MANUAL


Guaranteed Fast Delivery
For all orders

Quick and Efficient
Customer service

Easy Returns
Up to 30 days

1-Year Warranty
On All Products


Customer Reviews
5.0 Based on 1 Reviews
5 ★
100% 
1
4 ★
0% 
0
3 ★
0% 
0
2 ★
0% 
0
1 ★
0% 
0
Write a Review

Thank you for submitting a review!

Your input is very much appreciated. Share it with your friends so they can enjoy it too!

Filter Reviews:
LJ
10/23/2021
Lucas J.

Great BUY

Took a chance on this one, I was sitting with my DP and we were discussing the next shoot. Our Ronin was not going to work for this shoot neither was our other stabilizers. This Fly cam supported our C300 Mark II without a problem with a sigma 150-600mm. 5 stars




  • Hello! Is it possible to lock position of the bar so it will not rotate?

    The Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb) will rotate at 180°. If you want to make the bar static in one position/ direction then you need to hold the camera manually.