Skip to content

Flycam Flowline Professional Series 12-19kg / 26-42lb

Ergonomic Body Support for Camera & Gimbals

Save 14% Save 14%
Original price US $506.00
Original price US $506.00 - Original price US $506.00
Original price US $506.00
Current price US $437.00
US $437.00 - US $506.00
Current price US $437.00
PayPal
SKU : FLCM-FLN-600N
Select Your Flycam Flowline: 12kg to 15Kg (FLCM-FLN-600N)

Also Available in Warehouses: Canada | Europe | USA

AT A GLANCE


Payload
12-19kg
Extension
13cm | 5inch
Compatible With
Camera support and production workflows
Best For
Production Support
On-Set Workflows
Equipment Organization

Secure checkout | Fast delivery | 30-day returns | 1-year warranty

Flycam Flowline Professional Series

01.

THE MOST COMFORTABLE SHOOTING EXPERIENCE
We understand extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.
NOTE: It is recommended to attach the minimum required weight for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.

Flycam Flowline Professional Series 12-19kg / 26-42lb
Flycam Flowline Professional Series 12-19kg / 26-42lb

02.

THE FLOWLINE VEST
The Flowline Vest has Multiple Layers of Padding which ensures more support around the waist, allowing you to mount large setups and shoot for longer duration comfortably. It has a flexible belt system & adjustable vest rods on sides which will enable a comfortable fit for all body types.

03.

SMOOTHER STEADIER SHOTS!
The Harness takes the weight off your neck, arms and shoulders, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots. The Support Rope also adds a point of Contact which reduces Vibrations.

Flycam Flowline Professional Series 12-19kg / 26-42lb
Flycam Flowline Professional Series 12-19kg / 26-42lb

04.

ADAPTIVE CAMERA SUPPORT RIG
This Flowline System has various options such as Flowline 300N, 400N, 500N, 600N and 750N and fits multiple Camera and Gimbal Setups between the weight range of 5kg/11lbs to 19kg/42lbs. You can choose the Flycam Model depending on the Payload you plan putting on it and it’ll self-balance that load using the Gas Springs integrated into the design.
The Height adjustable support bar enables you to adjust the height of the support arm according to your requirement. The top bar also allows for 360° rotation to capture shots with incredible freedom of movement.

05.

BUILT TO LAST
We know set life can take a toll on your gear. Built with the highest quality materials and custom-designed Gas Springs, the Flycam Flowline is sure to last you a lifetime. It comes in a high-quality protective bag that lets you easily carry it with you around the world.

Flycam Flowline Professional Series 12-19kg / 26-42lb

“Images and videos are for demonstration purposes only.”

IN-ACTION VIDEOS

SPECIFICATIONS

FLOWLINE 600N

Payload Capacity

Min-Max: 12kg - 15kg (26lb - 33lb)

NOTE: Using Placid (FLCM-FLN-PLA) with this Flowline model will impact the minimum and maximum payload capacities.

Height

Flycam Flowline Professional Series 12-19kg / 26-42lb

Suspension line 

  Length: 107cm | 42inch when fully stretched
  Material: 3mm Nylon

Top Bar Length

  Including extension : 470mm
  Excluding extension : 340mm

Waist hip strap length

  Min - Max: 87cm - 107cm (34inch - 42inch)

Extension

  13cm | 5inch

Product Weight (Without Packing)

  Complete 4kg (9lb)

FLOWLINE 750N

Payload Capacity

Min-Max: 15kg - 19kg (33lb - 41lb)

NOTE :Using Placid (FLCM-FLN-PLA) with this Flowline model will impact the minimum and maximum payload capacities.

Height

Flycam Flowline Professional Series 12-19kg / 26-42lb

Suspension line 

  Length : 107cm | 42inch when fully stretched
  Material : 3mm Nylon

Top Bar Length

  Including extension : 470mm
  Excluding extension : 340mm

Waist hip strap length

  Min - Max : 87cm - 142cm (34inch - 56inch)

Extension

  13cm | 5inch

Product Weight (Without Packing)

  Complete 4kg (9lb)

IN THE BOX

            Flycam Flowline Professional Series 12-19kg / 26-42lb Packing


delivery

Guaranteed Fast Delivery
For all orders

customer service

Quick and Efficient
Customer service

easy returns

Easy Returns
Up to 30 days

warranty

1-Year Warranty
On All Products





  • Does this come with the shoulder rig ?

    No, the shoulder rig is not included with this Flowline model.

  • Can I purchase extra spring of higher strength to change and use heavier camera with it ?

    Yes, you can buy extra springs of higher strength to use for heavier camera setup.

  • What is the weight of the Flowline ?

    The Flycam Flowline itself weighs 4kg.

  • For how long can I use it continuously ?

    This Flycam Flowline system can be used for whole day without any fatigue.

  • Can I use the Flowline placid arm with this Flycam flowline ?

    Yes, you can use the Flowline placid arm with this Flycam flowline model.

  • Will this work with my easyrig model?

    Yes, this will work with your easyrig model. You just need to drill a hole for mounting the placid arm onto your rig.

  • Does it come in bag packing ?

    Yes, this Flycam Flowline comes in a bag packing for easy transportation.

  • What is the warranty ?

    We provide 1 year warranty from the date of purchase. Items which are covered by the warranty period will be replaced at no cost to the customer. Replacement parts of the product will be provided at nominal cost (covering the cost price of the replacement parts only) to the customers after the Warranty Period has expired.

  • Can I use cage with this flowline ?

    Yes, you can use a cage with this flowline.

  • The rugged rubber in the post behind his neck is a suspension system or is just a cover?

    The rubber section on the vertical bar behind the neck is not a suspension system. It is simply a protective cover that conceals the connection point between the upper and lower sections of the bar.

  • Is it possible to mount a camera rig that is lighter than 33 lbs? Will there be any problems in doing so?

    It will not work properly.The camera rig will need to be between 33 to 41.9 pounds for the system to work. For a lighter payload, you can use the Flowline 600N, which has a payload capacity of 26lb - 33lb.

  • How do you adjust the tension on the suspension line for this specific model such as 33lbs to 41lbs?

    There is no adjustment knob on the FLYCAM Flowline 750N.

  • What is the correct spare part for the counterweight system, what type of gas suspension or hydraulic piston does it have?

    The Flycam Flowline 750N has the 750N Hydraulic Gas Spring.

  • Whether I can attach a gimbal such as Ronin SC 2 to this Flowline. If it needs other accessories to make that work

    Yes, you can attach the Ronin SC 2 gimbal with the Flycam Flowline 750N but you need the Proaim handheld Star Ring P-STRG-01.

  • Height riser is compatible with 750N ?

    The Flycam Height Riser for Flowline Body Support Rigs is not compatible with the Flycam Flowline Professiona Series 750N.

  • What happens if I exceed a 15 Kg camera rig ?

    The Flycam Flowline 600N is compatible with 12-15kg weight only. For above 15kg, we would recommend buying the Flycam Flowline 750N.