Skip to content

Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb)

With 180° Rotation

Original price US $525.00 - Original price US $525.00
Original price
US $525.00
US $525.00 - US $525.00
Current price US $525.00
SKU : B-FLCM-FLN-01

Flycam Flowline Starter for Camera & Gimbals

01.

THE MOST COMFORTABLE SHOOTING EXPERIENCE
We understand, extended handheld camerawork can prove to be a backbreaker. The Flycam Flowline takes the weight off your shoulders and arms and redistributes it across the entire back using the Comfortable and Breathable Body Harness.
Note: It is recommended to attach the minimum required weight (3kg / 6lb) for pulling down the balancing rope to ensure proper operation of your Flycam Flowline system.

Flycam Flowline Starter for Camera & Gimbals

02.

SMOOTHER STEADIER SHOTS!
The Harness takes the weight off your arms and shoulder, letting you hold the camera steady for longer duration without fatigue, resulting in smoother and Steadier Shots. The Top Bar with 180° Rotation capability allows easy camera movements in different angles. The Support Rope also adds an additional point of Contact which reduces Vibrations.

03.

THE MOST VERSATILE CAMERA SUPPORT RIG
This Flowline System has been designed to accommodate all Camera and Gimbal Setups between 3kg to 7.5kg (6lb / 16lb).
The spring tension can be adjusted to balance the load placed on the Support Rope by turning the knob present on the back of the rig.

Flycam-Flowline-Starter-for-Camera-&-Gimbals

SPECIFICATIONS

Payload Capacity 

Min - Max: 3kg - 7.5kg (6lb - 16lb)

NOTE: Using Placid (FLCM-FLN-PLA) or Edge V1 (FLCM-EDGE-V1) with this Flowline model will impact the minimum and maximum payload capacities.

Support Arm Rotation

  180°

Flowline Weight

  Complete 3.6kg / 8lb

Height 

  Mounted: 100cm | 39.4inch
  Folded: 64cm

Suspension Line

  Material: 3mm Nylon
  Length (Rope): 152.5cm | 60inch When fully stretched

Top Bar 

  Length: 480mm
  Rotation: 180°

Waist hip strap length

  Min-Max: 81cm - 125cm (32 inch - 49 inch)

Dimensions

Flycam-Flowline-Starter-Body-Rig

Product Weight (Without Packing)

  3.8kg / 8.3lb

Product Volumetric Weight (With Packing)

  11.5kg / 25.4lb

IN THE BOX

Flycam Basic Flowline with 180° Rotation
Bag

USER MANUAL


delivery

Guaranteed Fast Delivery
For all orders

customer service

Quick and Efficient
Customer service

easy returns

Easy Returns
Up to 30 days

warranty

1-Year Warranty
On All Products


Customer Reviews
5.0 Based on 1 Reviews
5 ★
100% 
1
4 ★
0% 
0
3 ★
0% 
0
2 ★
0% 
0
1 ★
0% 
0
Write a Review

Thank you for submitting a review!

Your input is very much appreciated. Share it with your friends so they can enjoy it too!

Filter Reviews:
LJ
10/23/2021
Lucas J.

Great BUY

Took a chance on this one, I was sitting with my DP and we were discussing the next shoot. Our Ronin was not going to work for this shoot neither was our other stabilizers. This Fly cam supported our C300 Mark II without a problem with a sigma 150-600mm. 5 stars




  • Hello! Is it possible to lock position of the bar so it will not rotate?

    The Flycam Flowline Starter for Camera & Gimbals (3-7.5 kg / 6-16 lb) will rotate at 180°. If you want to make the bar static in one position/ direction then you need to hold the camera manually.

  • Can the camera move freely while using the Flowline Starter?

    Yes, the top bar features 180° rotation.

  • What camera weight can the Flycam Flowline Starter support?

    The system supports camera and gimbal setups between 3kg and 7.5kg (6lb–16lb)

  • Can beginners use the Flycam Flowline Starter easily?

    Yes, the system features simple spring tension adjustment and a straightforward setup suitable for beginners and professionals.

  • How is camera weight balanced on the Flowline Starter?

    The spring tension knob on the back adjusts resistance to balance the camera weight suspended from the support rope.

  • Can the Flycam Flowline Starter be used with gimbals?

    Yes, the Flowline Starter supports most gimbals and camera rigs within the 3–7.5kg payload range.

  • What is the minimum camera weight required for proper operation?

    A minimum setup weight of 3kg (6lb) is recommended to properly tension the balancing support rope.

  • what if I will use it with more weight (8kg or 9kg) than it supports? It's possible or what's the risks?

    The weight capacity of B-FLCM-FLN-01 is 3-7.5 kg / 6-16 lb and would recommend to use the camera setup weight in this range to get the perfect and steadier shots.

  • What is the use of washers and velcro you provide with the Flycam flowline starter? You have not shown any use of them.

    Regarding your query on the washer and velcro, I would like to inform you that we provide an extra washer so that it can be used with the knob on the back mechanism of the flowline when required.
    For Velcro, it is used to fasten the hook to the arm during packaging (when it is not in use). This prevents it from moving around and getting damaged.

  • That is the size and length of the marked knob of Basic Flowline Stabilizing Support Vest with 180°?

    M4 X 12MM